This is the attempt to fix the train bridge crossing between Palo Alto and Menlo Park.
Spoke to the engineer in charge and said this is sufficient to keep the water from eroding the foundation. I mentioned his ass is on the line.



https://chat.openai.com/share/9ee1f96e-78ee-4966-b875-f85042ac5b84
You must be logged in to post a comment.